Commissioning & Flushing

Two-Step Chemical Flushing for New Installations

Pre-commissioning flushing removes welding residues, construction debris, and standby-period corrosion before system startup. The two-step workflow: NANO CLEAN then NANO CLEAN NR.

Commissioning Services

Pre-Commissioning Flushing

Equipment:
New heating, cooling, and HVAC installations prior to system startup
Products:
NANO CLEAN (primary) · NANO CLEAN NR (neutralization)

Two-step chemical flushing of newly installed heating and cooling systems. Removes welding residues, slag, oil films, concrete debris, and standby-period corrosion accumulated during construction. Essential for new commercial and industrial installations. Targeted at MEP contractors, new mall builds, hotels under construction, and new industrial facilities.

Post-Cleaning System Neutralization

Equipment:
Any system after acidic chemical cleaning or flushing
Products:
NANO CLEAN NR (primary)

pH stabilization of systems and discharge water following chemical cleaning operations. Ensures safe discharge compliance with municipal wastewater regulations and prepares systems for protective conditioning. Mandatory step in every chemical cleaning workflow.

The Two-Step Flushing Workflow

1

Step 1Clean

Apply NANO CLEAN to dissolve welding residues, construction debris, oil films, and standby-period corrosion. Circulate through the new system. Duration and concentration based on system size and fouling load.

2

Step 2Neutralize

Apply NANO CLEAN NR to rapidly neutralize acidic residues. Stabilizes system pH. Ensures discharge complies with municipal wastewater regulations. System is ready for protective conditioning dosing.